Home / Projects / Net Zero Pod heat pump at Grantham Meres Leisure Centre
Net Zero Pod heat pump at Grantham Meres Leisure Centre
A new, decarbonised heating system, installed in 2 months with minimum disruption, for Leisure Energy.
Site: Grantham Meres Leisure Centre, Grantham, Lincolnshire, for Leisure Energy
Net Zero Pod
Heat pump
Leisure centres and pools
Year
2026
Plant
Net Zero Pod heat pump
Programme
2 months
Electrical
New distribution board and circuits for pool filtration pumps and controls
Client
Leisure Energy
The brief
The leisure centre’s heating needed decarbonising, with as little disruption to the centre as possible.
What we did
We installed a Net Zero Pod heat pump, giving the centre a new heating system. We also fitted a new distribution board and circuits for the pool filtration pumps and control panels in the pool pumphouse, certified to BS 7671.
Result
A new, decarbonised heating system, installed in 2 months with minimum disruption to the centre.
Related services
Got a similar project?
Send us drawings, a scope or a short description and we’ll get back to you within 24 hours.
Phone: 0161 564 0895 · Email: projects@echo-es.co.uk
