Commercial heat pump, CHP, solar and battery installation

We install plant-scale low-carbon and on-site generation equipment in leisure centres, hotels and commercial buildings: heat pumps, combined heat and power (CHP) units, solar PV and battery storage (BESS). We do the mechanical, electrical and civils works, through to commissioning.

Echo Engineering installs the plant. Our sister company Echo Energy supplies and runs the generation (CHP and solar PV).

What’s included

  • Heat pumps: commercial heat pump installations, including Net Zero Pod units.
  • CHP: units from 50 kW to 1 MW. The largest we’ve installed is 1 MW.
  • Solar PV: installation, including the electrical connections. Solar PV and electrical work is where the company started in 2013.
  • Battery storage (BESS): installation and electrical connection.
  • The works around the plant: equipment bases and buried pipework, gas, LTHW, exhaust and flues, ventilation, and electrical supplies.

How we deliver it

  1. Designed in 3D, built off siteWe model the installation, you approve it, and we fabricate the pipework in our own workshop, so time on site is short.
  2. Planned around the buildingMost of these jobs are in buildings that stay open, so we plan shutdowns and noisy work around them.
  3. One contractor for the whole installCivils, mechanical and electrical works are done by our own teams.
  4. Commissioned and signed offAt handover you get the test certificates for the job, and we offer servicing, breakdown support and training afterwards.

Projects

  • 2026 · Centrica Business SolutionsRadisson Blu DurhamA 230 kW CHP in a working hotel, with the full M&E package and test certificates handed over in November 2026. Read the case study ›
  • 2026 · Leisure EnergyGrantham Meres Leisure CentreA Net Zero Pod heat pump, installed in 2 months with minimum disruption, giving the centre a new heating system. Read the case study ›
  • 2021Fenton Leisure Centre, Stoke-on-TrentA 125 kW CHP, installed in 17 days on site thanks to off-site fabrication, with no health and safety incidents. Read the case study ›

Accreditations

  • NICEIC Approved ContractorElectrical work to BS 7671
  • Gas Safe registered business
  • CHASSSIP-approved contractor (CDM)
  • NICEIC Approved Contractor
  • CHAS accredited contractor
  • Gas Safe registered
  • REFCOM registered
  • SafeContractor accredited
  • CSCS