M&E and civils contractors
Mechanical, electrical and civils works for leisure, hotel and commercial buildings across the UK.
We fabricate stainless and carbon steel pipework in our own workshop and fit it with our own teams. Based in Oldham since 2013.
Leisure EnergyCentricaDavid LloydGreater Manchester PoliceCo-opOn-Site EnergyBritish Gas
Clients include Centrica, British Gas, Leisure Energy, On-Site Energy, David Lloyd, the Co-op and Greater Manchester Police.

Gatehead Mill, Delph, Oldham
Since 2013
M&E and civils contractor based in Oldham since 2013
From drawings to commissioning
Echo Engineering Solutions is a mechanical, electrical and civils contractor based at Gatehead Mill in Delph, Oldham, with a team of more than 20. Since 2013 we’ve delivered over 300 projects: heating, gas, ventilation and electrical installations, boiler and plant room replacements, and the civils that go with them, mostly in buildings that stay open while we work. We do most of it in house: 3D co-ordinated design, pipework fabrication in our own workshop, installation, commissioning and aftercare.
2013
Trading since
300+
Projects delivered
20+
Staff
1 MW
Largest CHP unit we’ve installed
M&E installation
- Heating (LTHW) pipework, gas, flues and exhaust, ventilation
- Distribution boards, power and control wiring to BS 7671
- NICEIC Approved Contractor and Gas Safe registered
We install the mechanical and electrical services as one package, so you deal with one contractor and one programme. Our electricians and pipefitters work side by side, which keeps plant rooms tidy and handovers simple.
Civils
- Equipment bases for new plant
- Excavation and buried pipework
- Builders’ work that goes with M&E installations
Our own civils team prepares the ground for the mechanical and electrical work, so the bases, trenches and openings are ready when the plant arrives. Having one contractor for civils and M&E means fewer handovers between trades.
Prefabricated pipework
- Our own fabrication workshop
- Separate areas for stainless and carbon steel
- 3D co-ordinated drawings approved by you before fabrication
- Package plant rooms and skids
We build welded pipework in the workshop, where every joint gets good access, light and checks. Less fabrication in your building means shorter shutdowns, less hot work and less disruption.
Boiler and plant room replacement
- Commercial boiler replacement in leisure and commercial plant rooms
- Gas, flue and LTHW alterations, with pipe freezing to avoid draining down
- Electrical work, builders’ work and thermal insulation in the same package
- Water treatment: Hydrosphere licensed
We replace boilers and plant in buildings that can’t close, planning the work around the people using them. At South Charnwood Leisure Centre we replaced six 115 kW boilers.
Heat pump, CHP, solar and battery installation
- Heat pumps, including Net Zero Pod units
- CHP units from 50 kW to 1 MW
- Solar PV installation, with the electrical connections
- Battery storage (BESS) installation
We install the plant: the mechanical, electrical and civils works, through to commissioning. Our sister company Echo Energy supplies and runs the generation (CHP and solar PV). Recent jobs include a 230 kW CHP at Radisson Blu Durham and a Net Zero Pod heat pump at Grantham Meres Leisure Centre.
Aftercare
- Servicing
- Breakdown support
- Training for your staff at handover
We stay involved after handover, with servicing, breakdown support and training so your team knows how to run the systems we’ve installed.
Accreditations & documents
Our NICEIC, CHAS and Gas Safe details, plus our policies and health and safety documents.
Recent projects
M&E, plant room, pipework, CHP and heat pump jobs for hotels, leisure centres and industry.
How we run a job
You speak to an engineer from the first call. We survey the site, design the solution (with 3D models where they help) and price it in full. We take on the CDM duties, fabricate the pipework in our own workshop, install with our own mechanical, electrical and civils teams, and commission the system. After handover we offer servicing, breakdown support and training for your staff.
Sectors we work in
We know buildings that have to stay open while we work.
Leisure centres and pools
Health and fitness clubs
Hotels
Stadiums and sports venues
Universities and research buildings
Manufacturing and industrial sites
Recent sites include the London Eye, Radisson Blu Durham, Photronics and McBurney Refrigeration.
Latest projects
Recent M&E jobs, including CHP and heat pump installations.
Case study2026
Radisson Blu Durham, 230 kW CHP installation
230 kW CHP at Radisson Blu Durham for Centrica Business Solutions. We did the full M&E package (gas, LTHW, ventilation, exhaust, electrics and insulation) around a working hotel, and handed over all test certificates in November 2026.
Case study2021
Fenton Leisure Centre, Stoke-on-Trent, 125 kW CHP
125 kW CHP at a working leisure centre. Designed in 3D, pipework made in our workshop, installed by our own team. 17 days on site, with no H&S incidents.
Case study2026
Grantham Meres Leisure Centre, Net Zero Pod heat pump
A Net Zero Pod heat pump for Grantham Meres Leisure Centre, for Leisure Energy. A new low-carbon heating system, installed in 2 months with minimum disruption.
“We’ve used Echo Engineering as a trusted supplier for more than 10 years. They’re responsive, reliable and their engineers are excellent. Most recently they installed the 230 kW CHP at Radisson Blu Durham, planning the work around a working hotel. Whatever the job, they deliver a great result every time.”
James Prescott, Senior Project Manager, Centrica
Got a project coming up?
Send us drawings, a scope or a short description and we’ll get back to you within 24 hours.






