Home / Projects / 230 kW CHP at Radisson Blu Durham

230 kW CHP at Radisson Blu Durham

A 230 kW CHP and the full M&E package in a working hotel, for Centrica Business Solutions.

Site: Radisson Blu Durham, for Centrica Business Solutions

230 kW

CHP

Hotels

Year

2026

CHP size

230 kW

Client

Centrica Business Solutions

Scope

Gas, LTHW, heat trim and radiators, ventilation, exhaust, electrical, insulation

Certificates

Gas test and purge, LTHW pressure test and electrical test, November 2026

The brief

Centrica Business Solutions needed a new 230 kW combined heat and power (CHP) unit at Radisson Blu Durham, connected into the hotel’s existing heating, gas and electrical systems.

What we did

We delivered the full M&E package:

  • Decommissioning
  • Gas installation
  • LTHW pipework, heat trim and radiators
  • Ventilation
  • Exhaust
  • Electrical installation, including the CHP electrical supply
  • Thermal insulation

We planned the work around the hotel, including lagging done in weekend slots agreed with the client.

Result

The CHP was installed and tested. The gas test and purge, LTHW pressure test and electrical test certificates were handed over in November 2026.

“We’ve used Echo Engineering as a trusted supplier for more than 10 years. They’re responsive, reliable and their engineers are excellent. Most recently they installed the 230 kW CHP at Radisson Blu Durham, planning the work around a working hotel. Whatever the job, they deliver a great result every time.”

James Prescott, Senior Project Manager, Centrica

Got a similar project?

Send us drawings, a scope or a short description and we’ll get back to you within 24 hours.

Phone: 0161 564 0895 · Email: projects@echo-es.co.uk