Home / Projects / Six-boiler replacement at South Charnwood Leisure Centre

Six-boiler replacement at South Charnwood Leisure Centre

Six Remeha Quinta Ace 115 kW boilers replaced, for Leisure Energy.

Site: South Charnwood Leisure Centre, Syston, Leicestershire, for Leisure Energy

6 × 115 kW

Boilers

Leisure centres and pools

Year

2026

Plant

Six Remeha Quinta Ace 115 kW boilers

Client

Leisure Energy

Status

Finished

The brief

The leisure centre’s existing boilers needed replacing.

What we did

We removed the existing boilers, then supplied and installed six Remeha Quinta Ace 115 kW boilers.

Result

The six new boilers are installed and the job is finished.

Got a similar project?

Send us drawings, a scope or a short description and we’ll get back to you within 24 hours.

Phone: 0161 564 0895 · Email: projects@echo-es.co.uk